Sheraton Hotel, Bahrain

Foyer roofing in the Sheraton Hotel, Manama/Bahrain made of silicon-coated fibreglass fabric. Two linked double layered conical structures span the foyer (26 m x 13 m). The supporting steel structure is made of steel pipes. The top covers are stainless steel cylinders and the top and side connections are clamped.


customer: Metras W.L.L. | covered area: 300 m² | design: Textil Bau GmbH | statics, detail planning: SMP | steel construction: Glasstech International L.L.C. | membrane production: K. Daedler e. K. | fabric: Atex 5000 TRL | completion: 2002